Railway Bridge, Dnipro

Sandblasting and anti-corrosion protection of railway bridge metal structures. Full cycle: cleaning to Sa 2½ + 3-layer coating system.

Before
Before — Railway Bridge, Dnipro
After
After — Railway Bridge, Dnipro

Project Metrics

Area
2 400 м²
Standard
Sa 2½
Duration
18 днів

Work Details

  • 1Copper slag blasting to Sa 2½ (ISO 8501)
  • 2Epoxy zinc primer — 80 μm
  • 3Epoxy intermediate coat — 120 μm
  • 4Polyurethane topcoat — 60 μm
  • 5Total coating thickness: 260 μm